如果您无法下载资料,请参考说明:
1、部分资料下载需要金币,请确保您的账户上有足够的金币
2、已购买过的文档,再次下载不重复扣费
3、资料包下载后请先用软件解压,在使用对应软件打开
SH/T3903-2004SH/T3903-2004SH/T3903-A.1工程开工/复工报审表WorksCommencement/ResumptionApprovalRequest工程名称WorksTitle:编号ItemNo:致(监理单位)To(CS/CMC)我单位承担的工程,已完成了以下各项工作,具备了□开工/□复工条件,特此申请施工,请核查并签发□开工/□复工指令。Wehavefulfilledthefollowingactivitiesfortheworkcontractedbyus,the□workscommencement/□worksresumptionconditionsareavailable,thereforetheconstructionisappliedhereby,pleasereviewandissue□workscommencement/□worksresumptionorders.附Attached:1开工报告commencementReport;2证明文件Supportingdocuments。项目经理ProjectManager承包单位(章)日期Contractor(Chop)Date审查意见ReviewComments:总监理工程师ChiefSupervisionEngineer项目监理机构日期CS/CMCDateSH/T3903-A.2施工组织设计(方案)报审表ConstructionOrganizationDesignApprovalRequest工程名称WorksTitle:编号ItemNo:致(监理单位)To(CS/CMC)我方已根据施工承包合同的有关规定完成了工程施工组织设计(方案)的编制,并经我单位技术负责人审查批准,请予以审查。Accordingtotherelatedregulationsoftheconstructioncontract,wehavecompletedthepreparationoftheconstructionorganizationdesign,andithasbeenreviewedandapprovedbythetechnicalresponsiblepeopleofourcompany,pleasereviewit.附Attached:□施工组织设计/□施工方案。□ConstructionOrganizationDesign/□ConstructionPlan。项目经理ProjectManager承包单位(章)日期Contractor(Chop)Date专业监理工程师审查意见Reviewcommentsfromdisciplinesupervisionengineer:专业监理工程师DisciplineSupervisionEngineer日期Date总监理工程师审核意见Reviewcommentsfromchiefsupervisionengineer:总监理工程师ChiefSupervisionEngineer项目监理机构日期CS/CMCDateSH/T3903-A.3分包单位资格报审表SubcontractorQualificationApprovalRequest工程名称WorksTitle:编号ItemNo:致(监理单位)To(CS/CMC)经考察,我方认为拟选择的(分包单位)具有承担下列工程的施工资质和施工能力,可以保证本工程项目按合同的规定进行施工。分包后,我方仍承担承包合同的全部责任。请予以审查和批准。Afterinvestigation,wethinktheproposed(subcontractor)hasthequalificationandcapabilityforcontractingthefollowingworks,andcanassurethatthisworkswillbeconstructedasperthecontractregulations.Aftersubcontractingthisworks,westillholdthewholeresponsibilitiesofthelumpsumcontractor.Pleasereviewandapproveit.附Attached:1分包单位资质材料SubcontractorQualificationDocuments;2分包单位业绩材料SubcontractorPerformanceDocuments。分包工程名称(部位)Subcontractedworks(Location)工程数量WorksQ