石材施工组织方案实用文档.doc
上传人:天马****23 上传时间:2024-09-10 格式:DOC 页数:66 大小:1.9MB 金币:10 举报 版权申诉
预览加载中,请您耐心等待几秒...

石材施工组织方案实用文档.doc

石材施工组织方案实用文档.doc

预览

免费试读已结束,剩余 56 页请下载文档后查看

10 金币

下载此文档

如果您无法下载资料,请参考说明:

1、部分资料下载需要金币,请确保您的账户上有足够的金币

2、已购买过的文档,再次下载不重复扣费

3、资料包下载后请先用软件解压,在使用对应软件打开

石材施工组织方案实用文档(实用文档,可以直接使用,可编辑优秀版资料,欢迎下载)新康花园墙面干挂石材工程施工方案审批:陕西景幕建筑装饰工程公司2021年5月17日目录一、工程概况及施工条件······································3(一)编制说明···········································3(二)工程概况···········································4(三)项目管理目标·······································4二、施工准备··············································5(一)材料准备··········································5(二)施工机具准·······································6(三)作业条件准备······································6三、施工工艺··············································6(一)施工工艺流程······································6(二)操作要求··········································7四、质量控制标准··········································9(一)主控项目··········································9(二)一般项目··········································10(三)其他质量要求·······································12五、工程质量保证措施·····································12六、成品保护·············································18七、安全及文明施工········································19(一)、材料堆放········································19(二)、临时用电········································19(三)、施工管理········································19(四)、安全要求········································20一、工程概况及施工条件(一)编制说明本《施工组织设计》为新康花园石材工程的施工组织设计,是规范和指导该项工程从施工准备到竣工验收过程的综合性技术经济文件,为使该项工程的施工全过程能按科学规律组织规范施工,有计划地开展各分部分项工程的施工,及时做好各项施工准备工作,保证各种资源和劳动力的及时供应;协调与各工种之间的时间安排,保证施工的顺利进行,按期保质保量完成施工任务,特制订本施工组织设计。1.1适用范围本《施工组织设计》适用于新康花园1#、3#楼裙楼石材工程。1。2编制依据1、《建筑结构荷载规范》GB50009—2001(2006年版)2、《建筑设计防火规范》GB50016—20063、《建筑用不锈钢绞线》JG/T200—20074、《建筑幕墙》GB/T21086-20075、《混凝土用膨胀型、扩孔型建筑锚栓》JG160-20046、《石材幕墙工程施工工艺标准》;GY1003—2003/8/161.3编制原则(1)认真贯彻国家对工程建设的各项方针、政策、相关规范和标准,严格执行工程建设程序。全过程地接受业主及监理的管理与监督,认真按行业主管部门指导意见开展工作.(2)遵循建筑施工工艺及其技术规律,坚持合理的施工程序和施工顺序.(3)采用流水施工方法、工程网络计划技术和其它现代管理方法,组织有节奏、均衡、连续施工。(4)充分利用现有施工机械和设备,扩大机械化施工范围,提高施工项目机械化程度;不断改善劳动条件,提高劳动生产率。(5)尽可能采用先进施工技术、科学地确定施工方案;严格控制工程质量、施工进度,确保文明安全施工,努力缩短工期,不断降低工程成本。(6)尽量减少施工设施,合理储存建设物资,科学地规划施工平面图,减少施工用地。(二)工程概况工程项目名称:新康花园;项目地点